Week 8 and we are continue to gallop ahead!! - Phil has been here for the past 4 days and completed tiling the floor - the door in the dining room is in as are all the windows. Phew.....turn that heating down Karen!!- the draughts from the make shift plastic have now gone!
Its all begining to look habitable now.
We are still performing culinary delights with the microwave (art art form in itself!), washing up in the utility sink and occasionally find ourselves singing campfire songs!!
So....floors get sealed tomorrow, second fix plumbing and electrics start on Thursday morning, kitchen arrives on Thursday afternoon and gets installed on Monday and after that, the decorating starts - now comes the tricky bit......COLOURS!!!!!!
Outside, the soak away needs to be constructed (2 mtre hole filled with rubble and stuff) drain pipes and guttering to be put up, and a bit of hard landscaping to do ahead of the winter.
I`m not sure I really I want this to end - its becoming quite addictive - should I become a property developer?........I dont think so!
Be back in a week........
Monday, 30 September 2013
Friday, 20 September 2013
The Build - Week 7
Yes I know it`s a bit late but to be honest the work over the last two weeks has been productive but by its very nature ....slow! Plastering, Plumbing, knocking through walls oh...and...cleaning up - plenty of cleaning up!!!
Having said all that we are galloping toward the finishing post, rooms have now been plastered out (and very nice too!!!) thank you Lee and Steve!
Sink has now gone! so we are using the downstairs loo and utility room. The oven is just about functional (soon to see the skip!) but the dishwasher is still in perfect running order!!! mind you I do have to disconnect it every morning and then connect a temporary water supply up for the plasterers and then connect it up again in the evening for the washing up - such fun!!
Window frames are in, floor screeding next Tuesday, tiling on Thursday - and before all that the glass roof lantern on Monday.
Well it`s 6 pm and Lee is still here - he started at 7:30 so I1ve told him to go home and remind his 3 year old daughter who he is!!
Till next week then
Having said all that we are galloping toward the finishing post, rooms have now been plastered out (and very nice too!!!) thank you Lee and Steve!
Sink has now gone! so we are using the downstairs loo and utility room. The oven is just about functional (soon to see the skip!) but the dishwasher is still in perfect running order!!! mind you I do have to disconnect it every morning and then connect a temporary water supply up for the plasterers and then connect it up again in the evening for the washing up - such fun!!
Window frames are in, floor screeding next Tuesday, tiling on Thursday - and before all that the glass roof lantern on Monday.
Well it`s 6 pm and Lee is still here - he started at 7:30 so I1ve told him to go home and remind his 3 year old daughter who he is!!
Till next week then
Monday, 9 September 2013
The Build - Week 6
Well we have now re-started activity!!
Glass wall is in and looks pretty good - still nervous about scratches splashes and builders boots - so it spends most of its life folded back and covered up.Plaster board now on ceiling and lantern reveal - walls start tomorrow at 07:30
Big mess day on Saturday - cut out the new opening into hallway which now provides access to kitchen (by the way Tony the supports around the opening are not permanent) - despite covering everything with two layers, masking door jams, stuffing loft insulation into every crack and crevice the ground floor turned from cream to an interesting shade of Battleship Grey (that's concrete block dust to you and I)
Ever tried grey salt crystals on grey tomatoes with grey speckled bread, eaten off grey plates???
Red Cedar cladding arrives tomorrow - looking forward to that - if only for the smell of freshly sawn timber.
Somme conditions have returned to the garden following the rain - but hey I`m passed caring now
Windows nearly finished - scheduled for installation on the 19th
So, I hear you say, "has the time frame slipped?" - yes a little -"when do you expect the job to be finished you ask" I reckon end of October I say...... confidently!!!!!!
Oh!.. I forgot to say that during all that cutting business on Saturday Brock got very upset and made an attempt to leave the house for good - I promised him better times ahead - his own space in Brock House for example .......so he came back.....reluctantly!
More in week 7
Glass wall is in and looks pretty good - still nervous about scratches splashes and builders boots - so it spends most of its life folded back and covered up.Plaster board now on ceiling and lantern reveal - walls start tomorrow at 07:30
Big mess day on Saturday - cut out the new opening into hallway which now provides access to kitchen (by the way Tony the supports around the opening are not permanent) - despite covering everything with two layers, masking door jams, stuffing loft insulation into every crack and crevice the ground floor turned from cream to an interesting shade of Battleship Grey (that's concrete block dust to you and I)
Ever tried grey salt crystals on grey tomatoes with grey speckled bread, eaten off grey plates???
Red Cedar cladding arrives tomorrow - looking forward to that - if only for the smell of freshly sawn timber.
Somme conditions have returned to the garden following the rain - but hey I`m passed caring now
Windows nearly finished - scheduled for installation on the 19th
So, I hear you say, "has the time frame slipped?" - yes a little -"when do you expect the job to be finished you ask" I reckon end of October I say...... confidently!!!!!!
Oh!.. I forgot to say that during all that cutting business on Saturday Brock got very upset and made an attempt to leave the house for good - I promised him better times ahead - his own space in Brock House for example .......so he came back.....reluctantly!
More in week 7
Tuesday, 27 August 2013
The Build - Week 5
Well, things have come to a slight halt this week
Windows, door and roof lantern are still being made and without them we can`t get on with the plastering - we can however get on with first fix electrics and plumbing - the downside of that is that we are down to the bare minimum in terms of kitchen hardware we have a work surface the size of a decent tea tray, electric power is via a four way extension lead and washing up takes place in the utility room where dishes have to be washed by hand!
So where does all the kitchen stuff that was in the kitchen go I hear you ask - in every other room of the house I reply!!
Lots of Dunkirk spirit required over the next month I think
Anyway little more to say right now - once the windows etc arrive it`ll be all systems go again
In the meantime a few pictures to break the tedium
Until then.....then
Windows, door and roof lantern are still being made and without them we can`t get on with the plastering - we can however get on with first fix electrics and plumbing - the downside of that is that we are down to the bare minimum in terms of kitchen hardware we have a work surface the size of a decent tea tray, electric power is via a four way extension lead and washing up takes place in the utility room where dishes have to be washed by hand!
So where does all the kitchen stuff that was in the kitchen go I hear you ask - in every other room of the house I reply!!
Lots of Dunkirk spirit required over the next month I think
Anyway little more to say right now - once the windows etc arrive it`ll be all systems go again
In the meantime a few pictures to break the tedium
Until then.....then
Tuesday, 20 August 2013
Monday, 19 August 2013
The Build - Week 4
Well, what a difference a week makes!!
The "paint" has finally dried.
Final preparations for the roof/s were undertaken with brick fillets inserted the odd bit of block work finished off, oh, and Ruby made a special appearance for a couple of hours (regular readers of this blog will be familiar with Ruby)
Tuesday saw lots of lovely timber arriving - (I love the smell of freshly sawn timber...don't you?) along with Father and Son carpenters John & Alex, what a great team they turned out to be - polite, professional, tidy, highly skilled, and extremely efficient – and no bum cleavage!! - all of this does, of course come at a cost!!??
There is something rather magical about the ability to construct a roof with perfect joints and alignment from a pile of timber ( I have a chum who performs similar miracles with metal - you know who you are!)
So, the next three days saw the demolition and removal of the existing kitchen roof replaced by a super new one incorporating the new build and a complete set of trusses, perlins, soffits, facias and roof lantern frame The temporary lighting in the kitchen is a dead cert for Turner Prize shortlisting - judge for yourself.
Saturday morning saw the arrival of the tilers and roofers - 8am start - got on like a house on fire! - On that note, I had lit the wood burner in the morning in order to dry some clothes (we are without a clothes drier at the mo) and after about half an hour while I was in the kitchen a head came down through the lantern opening and the conversation went something like this:
Roofer: You are a very naughty man
JD: Why
Roofer: You`ve just lit you`r fire haven`t you?
JD: Yes, why?
Roofer: I`ve nearly had a heart attack
JD: Why?
Roofer: I`m up here on a timber roof with an industrial blow torch and I`m thinking....what part of the house have I just set fire to?????
JD & Roofer: Laugh out loud a lot!! Good note to end on I think!
Here`s to productive week 5
The "paint" has finally dried.
Final preparations for the roof/s were undertaken with brick fillets inserted the odd bit of block work finished off, oh, and Ruby made a special appearance for a couple of hours (regular readers of this blog will be familiar with Ruby)
Tuesday saw lots of lovely timber arriving - (I love the smell of freshly sawn timber...don't you?) along with Father and Son carpenters John & Alex, what a great team they turned out to be - polite, professional, tidy, highly skilled, and extremely efficient – and no bum cleavage!! - all of this does, of course come at a cost!!??
There is something rather magical about the ability to construct a roof with perfect joints and alignment from a pile of timber ( I have a chum who performs similar miracles with metal - you know who you are!)
So, the next three days saw the demolition and removal of the existing kitchen roof replaced by a super new one incorporating the new build and a complete set of trusses, perlins, soffits, facias and roof lantern frame The temporary lighting in the kitchen is a dead cert for Turner Prize shortlisting - judge for yourself.
Saturday morning saw the arrival of the tilers and roofers - 8am start - got on like a house on fire! - On that note, I had lit the wood burner in the morning in order to dry some clothes (we are without a clothes drier at the mo) and after about half an hour while I was in the kitchen a head came down through the lantern opening and the conversation went something like this:
Roofer: You are a very naughty man
JD: Why
Roofer: You`ve just lit you`r fire haven`t you?
JD: Yes, why?
Roofer: I`ve nearly had a heart attack
JD: Why?
Roofer: I`m up here on a timber roof with an industrial blow torch and I`m thinking....what part of the house have I just set fire to?????
JD & Roofer: Laugh out loud a lot!! Good note to end on I think!
Here`s to productive week 5
Wednesday, 7 August 2013
The Build - Week 3
Ever watched paint dry?,,,,,well that is what week three has all been about - activity has been a plenty but crikey it`s been boring!!!
Lots of brick cutting, measuring, more brick cutting and laying - more measuring an so on. I suppose every project has a period when despite there being a lot going on - little appears to be progressing.
Anyway, having said that all the bricks that need to have been laid, have been laid and the lintels have gone up together with the wall plates (note, I`m trying to make this sound interesting!)
Next week sees the roof being constructed which should - no - will be a jolly site more interesting that the week just gone
The only consolation is that Ruby, the bricklayers Terrier seems to have taken up residence in the house!!!!!!!
Have a look at these pictures and judge for yourself how dull this week has been!,,,,,,,,,,
Lots of brick cutting, measuring, more brick cutting and laying - more measuring an so on. I suppose every project has a period when despite there being a lot going on - little appears to be progressing.
Anyway, having said that all the bricks that need to have been laid, have been laid and the lintels have gone up together with the wall plates (note, I`m trying to make this sound interesting!)
Next week sees the roof being constructed which should - no - will be a jolly site more interesting that the week just gone
The only consolation is that Ruby, the bricklayers Terrier seems to have taken up residence in the house!!!!!!!
Have a look at these pictures and judge for yourself how dull this week has been!,,,,,,,,,,