The Build - Week 5

Well, things have come to a slight halt this week

Windows, door and roof lantern are still being made and without them we can`t get on with the plastering - we can however get on with first fix electrics and plumbing - the downside of that is that we are down to the bare minimum in terms of kitchen hardware we have a work surface the size of a decent tea tray, electric power is via a four way extension lead and washing up takes place in the utility room where dishes have to be washed by hand!

So where does all the kitchen stuff that was in the kitchen go I hear you ask - in every other room of the house I reply!!

Lots of Dunkirk spirit required over the next month I think

Anyway little more to say right now - once the windows etc arrive it`ll be all systems go again

In the meantime a few pictures to break the tedium

Until then.....then